It has been two months now since we closed on the Sheridan house. Our biggest priorities at the beginning were to secure the property, clear the lot, get the power turned on, get heat, get running water, install a security system, and complete a majority of the required demolition. We are still working on getting water, but, all things considered I think we are doing alright. The holiday season was a bit of a distraction, we both (like everyone else I hear) were sick for a bit, and working in the bitter cold has been rather demoralizing. With January more than half way through the worst should be behind us though, right?